Project checklist
A – Installation
Step | Description | Done |
|---|---|---|
A.1 | Ensure that the system requirements are met |
|
A.2 |
| |
A.3 |
|
B – Basic system configuration
Step | Description | Done |
|---|---|---|
B.1 |
| |
B.2 |
| |
B.3 |
|
C – Basic project setup
Step | Description | Done |
|---|---|---|
C.1 |
| |
C.2 |
| |
C.3 |
| |
C. 4 |
|
D – Set up Busmaster
Step | Description | Done |
|---|---|---|
D.1 |
| |
D.2 |
| |
D.3 |
|
E – Busmaster data acquisition
Step | Description | Done |
|---|---|---|
E.1 |
| |
E.2 | Assign visual energy locations to Busmaster locations. |
|
E.3 |
| |
E. 4 |
|
F – Create a distribution diagram
Step | Description | Done |
|---|---|---|
F.1 |
| |
F.2 |
|